First Schedule THE SCHEDULE
1[THE SCHEDULE

[See sections 20A and 41 (ha)]

Category of projects and Infrastructure Sub-Sectors

Sl. No.  Category Infrastructure Sub-Sectors

1 2 3

1. Transport (a) Road and bridges

(b) Ports (including Capital Dredging)

(c) Shipyards (including a floating or land-based facility with the

essential features of waterfront, turning basin, berthing and docking

facility, slipways or ship lifts, and which is self-sufficient for carrying

on shipbuilding/repair/breaking activities)

(d) Inland Waterways

(e) Airports

(f) Railway Track, tunnels, viaducts, bridges, terminal infrastructure

including stations and adjoining commercial infrastructure

(g) Urban Public Transport (except rolling stock in case of urban road

transport)

2. Energy (a) Electricity Generation

(b) Electricity Transmission

(c) Electricity Distribution

(d) Oil pipelines

(e) Oil/Gas/Liquefied Natural Gas (LNG) storage facility(including

strategic storage of crude oil)

(f) Gas pipelines (including city gas distribution network)

3. Water and

Sanitation

(a) Solid Waste Management

(b) Water supply pipelines

(c) Water treatment plants

(d) Sewage collection, treatment and disposal system

(e) Irrigation (dams, channels, embankments, etc.)

(f) Storm Water Drainage System

(g) Slurry pipelines

4. Communication (a) Telecommunication (Fixed network including optic fibre/wire/cable

networks which provide broadband/internet)

(b) Telecommunication towers

(c) Telecommunications and Telecom Services

1. Ins. by Act 18 of 2018, s. 14 (w.e.f. 1-10-2018).

Sl. No.  Category Infrastructure Sub-Sectors

1 2 3

5. Social and

Commercial

Infrastructure

(a) Education Institutions (capital stock)

(b) Sports infrastructure (including provision of Sports Stadia and

Infrastructure for Academies for Training/Research in Sports and

Sports-relating activities)

(c) Hospitals (capital stock including Medical Colleges, Para Medical

Training Institutes and Diagnostic Centres)

(d) Tourism infrastructure viz.

(i) three-star or higher category classified hotels located outside

cities with population of more than one million;

(ii) ropeways and cable cars

(e) Common infrastructure for industrial parks and other parks with

industrial activity such as food parks, textile parks, Special Economic

Zones, tourism facilities and agriculture markets

(f) Post-harvest storage infrastructure for agriculture and horticulture

produce including cold storage

(g) Terminal markets

(h) Soil-testing laboratories

(i) Cold chain (including cold room facility for farm level pre-cooling,

for preservation or storage of agriculture and allied produce, marine

products and meat)

(j) Affordable Housing (including a housing project using at least 50%

of the Floor Area Ratio (FAR)/Floor Space Index (FSI) for dwelling

units with carpet area of not more than 60 square meters

Explanation.—For the purposes of this sub-clause, the term “carpet

area” shall have the same meaning as assigned to it in clause (k) of

section 2 of the Real Estate (Regulation and Development) Act, 2016

(16 of 2016).]