THE JAMMU AND KASHMIR WATER RESOURCES (REGULATION AND MANAGEMENT) ACT, 2010
Administered Ministry: NO MINISTRY / PHE(I&FC)
Section
Section 41 Application for transfer of existing field channel.
(1) Any person desiring that a field channel should be transferred from its existing owner to him may apply in writing to the Assistant Executive Engineer, if he––
(a) has failed to procure such transfer from the owner of such field channel ;
(b) undertakes to bear the cost and to do all things necessary for procuring such transfer ; and
(c) has sufficient means to defray the cost of such transfer.
(2) If the Assistant Executive Engineer is satisfied that the said transfer is necessary for the better management of the irrigation from such field channel and that the statements in the application are true, he shall call upon the applicant to make such deposit as he considers necessary to defray the cost of the preliminary works and the amount of any compensation that may become due under the provisions of section 46 in respect of such transfer, and upon such deposit being made, he shall affix a notice of the application at a conspicuous place in the every village, and shall send a copy of the notice to the Tehsildar of every Tehsil, through which such field channel passes.
(a) has failed to procure such transfer from the owner of such field channel ;
(b) undertakes to bear the cost and to do all things necessary for procuring such transfer ; and
(c) has sufficient means to defray the cost of such transfer.
(2) If the Assistant Executive Engineer is satisfied that the said transfer is necessary for the better management of the irrigation from such field channel and that the statements in the application are true, he shall call upon the applicant to make such deposit as he considers necessary to defray the cost of the preliminary works and the amount of any compensation that may become due under the provisions of section 46 in respect of such transfer, and upon such deposit being made, he shall affix a notice of the application at a conspicuous place in the every village, and shall send a copy of the notice to the Tehsildar of every Tehsil, through which such field channel passes.
Section 42 Objections to transfer applied for.
(1) Within fourteen days of the affixation of notice under section 41, any person interested in the field channel to which the notice refers and having any objection to the transfer of such field channel, may apply to the Assistant Executive Engineer by petition stating his objections to such transfer.
(2) The Assistant Executive Engineer may either reject the petition or may proceed to enquire into the validity of the objections giving previous notice to persons concerned stating the place and time at which such enquiry shall be held :
Provided that such notice shall also be given to the Tehsildar of the area through which field channel passes.
(3) The Assistant Executive Engineer shall record in writing all orders passed by him under this section and the grounds thereof.
(2) The Assistant Executive Engineer may either reject the petition or may proceed to enquire into the validity of the objections giving previous notice to persons concerned stating the place and time at which such enquiry shall be held :
Provided that such notice shall also be given to the Tehsildar of the area through which field channel passes.
(3) The Assistant Executive Engineer shall record in writing all orders passed by him under this section and the grounds thereof.
Section 43 Transfer of field channel to the applicant.
If no such objection is made, or where any objection is made and the Assistant Executive Engineer rejects such objections, the Assistant Executive Engineer shall intimate the Tehsildar to that effect, and shall, with the agreement of the Tehsildar, transfer the field channel from the existing owner to the applicant.
Section 44 Procedure when objection is held valid.
If the Assistant Executive Engineer considers any objection made as aforesaid to be valid, he shall inform the Tehsildar accordingly
Section 45 Procedure when Tehsildar disagrees with Assistant Executive Engineer.
(1) If the Tehsildar disagrees with the Assistant Executive Engineer, the matter shall be referred for decision to the Executive Engineer and the decision of the Executive Engineer thereon shall be final.
(2) The Assistant Executive Engineer, if he is so directed by the Executive Engineer under sub-section (1), shall, subject to the provisions of section 46, transfer the field channel from the existing owner to the applicant.
(2) The Assistant Executive Engineer, if he is so directed by the Executive Engineer under sub-section (1), shall, subject to the provisions of section 46, transfer the field channel from the existing owner to the applicant.
Section 46 Expenses to be paid by the applicant before transfer of field channel
(1) No transfer of field channel shall be made until the applicant has paid to the person named by the Assistant Executive Engineer such amount as the Executive Engineer determines under sub-section (2) to be paid as compensation for transfer of field channel together with all expenses incidental to such transfer.
(2) The Assistant Executive Engineer shall recommend the amount to be paid as compensation by the applicant for transfer of field channel to him together with expenses incidental to such transfer to Executive Engineer who, in determining the compensation, shall follow the provisions of the State Land Acquisition Act, Samvat 1990.
(3) Any person aggrieved by the order of Executive Engineer under subsection (2) may prefer an appeal to the Superintending Engineer within a period of thirty days from the date of order. The order of the Superintending Engineer on such appeal shall be final.
(2) The Assistant Executive Engineer shall recommend the amount to be paid as compensation by the applicant for transfer of field channel to him together with expenses incidental to such transfer to Executive Engineer who, in determining the compensation, shall follow the provisions of the State Land Acquisition Act, Samvat 1990.
(3) Any person aggrieved by the order of Executive Engineer under subsection (2) may prefer an appeal to the Superintending Engineer within a period of thirty days from the date of order. The order of the Superintending Engineer on such appeal shall be final.
Section 47 Conditions binding on applicant.
(1) On transfer of a field channel to the applicant, the applicant or his representative in interest shall be bound to construct and maintain, to the satisfaction of the Assistant Executive Engineer and for the convenience of the neighbouring land, all the works necessary for––
(a) the passage across such field channel existing prior to its transfer ;
(b) the drainage intercepted by it ; and
(c) for providing proper communications across it.
(2) If any field channel transferred hereinabove is not used for three years continuously, the right of the applicant or of his representative in interest to occupy such field channel shall cease absolutely and same shall vest in the State.
(a) the passage across such field channel existing prior to its transfer ;
(b) the drainage intercepted by it ; and
(c) for providing proper communications across it.
(2) If any field channel transferred hereinabove is not used for three years continuously, the right of the applicant or of his representative in interest to occupy such field channel shall cease absolutely and same shall vest in the State.
Section 48 Construction and maintenance of filed channels.
(1) Whenever it appears expedient to the Assistant Executive Engineer either on his own motion or on the application of an owner or occupier or beneficiary that for better utilization of irrigation potential created by an irrigation work, field channels should be constructed in any area, he may cause to be served on the owner or occupier or beneficiary concerned a notice in the prescribed form containing the exact location of sluices or outlets on the irrigation works and specifying the area of irrigable land to be served by the same and direct them to construct such field channels at their own cost within a specified time which shall not be more than three months from the date of issue of the notice.
(2) If the owner or occupier or beneficiary fails to construct the field channels in his land as directed by the Assistant Executive Engineer under sub-section (1) within the time specified therein, the Assistant Executive Engineer may, after giving the owner or occupier a reasonable opportunity of being heard, construct the field channels at the cost of the Government and recover the cost plus 15 of the actual cost pro rata from such owner or occupier or beneficiary, as the case may be.
(2) If the owner or occupier or beneficiary fails to construct the field channels in his land as directed by the Assistant Executive Engineer under sub-section (1) within the time specified therein, the Assistant Executive Engineer may, after giving the owner or occupier a reasonable opportunity of being heard, construct the field channels at the cost of the Government and recover the cost plus 15 of the actual cost pro rata from such owner or occupier or beneficiary, as the case may be.
Section 49 Maintenance of field channels.
(1) It shall be the duty of every owner, occupier and beneficiary to maintain the field channels in a proper state of repairs at their own cast.
(2) If the Assistant Executive Engineer is of the opinion that any field channel is not being properly maintained, he shall, after providing an opportunity to the owner or occupier or beneficiary concerned to take such action as may be directed by him, proceed to have such repairs made as he may consider necessary at the cost of the owner or occupier or beneficiary plus 15 of the actual cost.
(2) If the Assistant Executive Engineer is of the opinion that any field channel is not being properly maintained, he shall, after providing an opportunity to the owner or occupier or beneficiary concerned to take such action as may be directed by him, proceed to have such repairs made as he may consider necessary at the cost of the owner or occupier or beneficiary plus 15 of the actual cost.
Section 50 Acquisition of land for construction of field channels.
When there is any dispute between the owners or occupiers or beneficiaries for the construction of a field channel, the Assistant Executive Engineer shall, recommend to the Executive Engineer concerned for acquisition of land in accordance with the provisions of section 34 :
Provided that the compensation payable for acquisition of land under this section shall be paid by the owners or occupiers or beneficiaries of such field channel.
Provided that the compensation payable for acquisition of land under this section shall be paid by the owners or occupiers or beneficiaries of such field channel.
Section 51 Preparation of draft scheme in culturable commanded area.
(1) The Executive Engineer concerned may, on his own motion or on the application of not less than fifty percent of the owners or occupiers of land in the culturable commanded area, prepare a draft scheme to provide for on-farm development on a group or block of fields.
(2) Every scheme prepared under sub-section (1) shall, among other matters, set out the cost of the on-farm development works, a sketch plan of the area proposed to be covered by the said scheme and the particulars of the owners or occupiers to be benefited by the such scheme.
(3) Every scheme shall, as soon as may be after its preparation, be published in such form and manner as may be specified inviting objections and suggestions with respect thereof within thirty days of the publication.
(4) After consideration of such objections, and suggestions, if any, the Executive Engineer shall approve the scheme either as it was originally published or in such modified form as he may consider fit and publish the same.
(5) The Superintending Engineer may at any time, or on an application made by any person aggrieved by the scheme approved under sub-section (4) within a period of thirty days from the date of publication of the scheme, revise or annul the scheme so approved :
Provided that such revision or annulment shall not be made without affording the person affected an opportunity of being heard.
(6) If the draft scheme is not approved by the Executive Engineer after its publication under sub-section (3) or if such scheme is annulled by the Superintending Engineer under sub-section (5), any owner or occupier or beneficiary aggrieved by such order of the Executive Engineer or the Superintending Engineer, as the case may be, may prefer an appeal, within thirty days of the passing of the order aggrieved against, to the prescribed authority whose decision thereon shall be final.
(7) After a scheme has been approved by the Executive Engineer under sub-section (4), or where an appeal has been preferred under sub-section (6) after it has been disposed of, the scheme shall be published in such manner as may be specified and upon such publication, it shall be executed or got executed by the owners or occupiers or beneficiaries in the group or block of fields at their cost, within such period of time as may be specified by the Executive Engineer.
(8) In the event of failure of any or all of the said owners or occupiers or beneficiaries to execute the works within the said period of time specified by the Executive Engineer, or in the event of any or all of the owners or occupiers or beneficiaries informing in writing the said Executive Engineer prior to the expiry of the said period of time, that they are unable to execute or get executed the works as required, the works may be carried out by the Executive Engineer and the cost of the works so executed shall be recoverable by the Executive Engineer from the owners or occupiers or beneficiaries who fail, or indicate their inability, to execute or get executed the works as required.
(9) The share of the individual owners or occupiers or beneficiaries of the cost of works executed in the said group or block of fields by the Executive Engineer shall be such as determined by the Executive Engineer.
(2) Every scheme prepared under sub-section (1) shall, among other matters, set out the cost of the on-farm development works, a sketch plan of the area proposed to be covered by the said scheme and the particulars of the owners or occupiers to be benefited by the such scheme.
(3) Every scheme shall, as soon as may be after its preparation, be published in such form and manner as may be specified inviting objections and suggestions with respect thereof within thirty days of the publication.
(4) After consideration of such objections, and suggestions, if any, the Executive Engineer shall approve the scheme either as it was originally published or in such modified form as he may consider fit and publish the same.
(5) The Superintending Engineer may at any time, or on an application made by any person aggrieved by the scheme approved under sub-section (4) within a period of thirty days from the date of publication of the scheme, revise or annul the scheme so approved :
Provided that such revision or annulment shall not be made without affording the person affected an opportunity of being heard.
(6) If the draft scheme is not approved by the Executive Engineer after its publication under sub-section (3) or if such scheme is annulled by the Superintending Engineer under sub-section (5), any owner or occupier or beneficiary aggrieved by such order of the Executive Engineer or the Superintending Engineer, as the case may be, may prefer an appeal, within thirty days of the passing of the order aggrieved against, to the prescribed authority whose decision thereon shall be final.
(7) After a scheme has been approved by the Executive Engineer under sub-section (4), or where an appeal has been preferred under sub-section (6) after it has been disposed of, the scheme shall be published in such manner as may be specified and upon such publication, it shall be executed or got executed by the owners or occupiers or beneficiaries in the group or block of fields at their cost, within such period of time as may be specified by the Executive Engineer.
(8) In the event of failure of any or all of the said owners or occupiers or beneficiaries to execute the works within the said period of time specified by the Executive Engineer, or in the event of any or all of the owners or occupiers or beneficiaries informing in writing the said Executive Engineer prior to the expiry of the said period of time, that they are unable to execute or get executed the works as required, the works may be carried out by the Executive Engineer and the cost of the works so executed shall be recoverable by the Executive Engineer from the owners or occupiers or beneficiaries who fail, or indicate their inability, to execute or get executed the works as required.
(9) The share of the individual owners or occupiers or beneficiaries of the cost of works executed in the said group or block of fields by the Executive Engineer shall be such as determined by the Executive Engineer.
Section 52 Power to prohibit obstructions.
Whenever it appears to the Government that injury or damage to any land has arisen or may arise from the encroachment upon any irrigation or flood control work, the Government may, by notification, prohibit, within limits to be defined in such notification, or may order the removal of, such encroachment.
Section 53 Power to remove obstructions after prohibition.
(1) The Executive Engineer may, after the notification under section 52, issue an order to the person causing or having control over any such encroachment to remove such encroachment within a time to be specified in the order.
(2) If within the time so specified, such person does not comply with the order, the Executive Engineer may remove the encroachment with the assistance of police force and recover the expenses involved in such removal from the person concerned :
Provided that the Executive Engineer may, in cases of emergency, remove the encroachment before the publication of notification and the expenses incurred on such removal shall be recovered from the person concerned.
(2) If within the time so specified, such person does not comply with the order, the Executive Engineer may remove the encroachment with the assistance of police force and recover the expenses involved in such removal from the person concerned :
Provided that the Executive Engineer may, in cases of emergency, remove the encroachment before the publication of notification and the expenses incurred on such removal shall be recovered from the person concerned.
Section 54 Preparation of schemes for drainage works.
(1) Whenever it appears to the Government that any drainage work, excluding field drain, is necessary in the interest of public health or for improvement of any land, or for the proper cultivation or irrigation thereof, or for protection from floods and other accumulation of water or injurious salts or for prevention of erosion by a water source, the Government may, by notification, declare that the drainage work shall be constructed after a day to be specified in the said notification not being earlier than three months from the date thereof.
(2) As soon as practicable after the issuance of notification under subsection (1), the Executive Engineer or any officer duly empowered by him in this behalf shall cause public notice to be given at convenient places, indicating the intention of the Government to construct the drainage work excluding field drain referred to in sub-section (1).
(3) The Government shall acquire land, if required, for construction of drainage works in accordance with the provisions of State Land Acquisition Act, Samvat 1990.
(2) As soon as practicable after the issuance of notification under subsection (1), the Executive Engineer or any officer duly empowered by him in this behalf shall cause public notice to be given at convenient places, indicating the intention of the Government to construct the drainage work excluding field drain referred to in sub-section (1).
(3) The Government shall acquire land, if required, for construction of drainage works in accordance with the provisions of State Land Acquisition Act, Samvat 1990.
Section 55 Scheme for field drains.
(1) Notwithstanding anything contained to the contrary in sub-section (1) of section 54, the Executive Engineer may cause a scheme for field drains to be drawn up.
(2) Every scheme drawn up under sub-section (1), amongst other matters, shall set out the estimated cost thereof, the alignment of the proposed field drain or realignment of the existing field drain, as the case may be, the particulars of the owners or occupiers to be benefited, the particulars of persons who may be affected thereby and sketch plan of the area proposed to be covered by the scheme.
(3) The provisions contained in sections 33, 34 and 36 to 38 shall apply mutatis mutandis to the scheme drawn up for field drains.
(4) The Executive Engineer may construct the field drains on behalf of the owners or occupiers and recover the cost pro rata from such owners or occupiers.
(2) Every scheme drawn up under sub-section (1), amongst other matters, shall set out the estimated cost thereof, the alignment of the proposed field drain or realignment of the existing field drain, as the case may be, the particulars of the owners or occupiers to be benefited, the particulars of persons who may be affected thereby and sketch plan of the area proposed to be covered by the scheme.
(3) The provisions contained in sections 33, 34 and 36 to 38 shall apply mutatis mutandis to the scheme drawn up for field drains.
(4) The Executive Engineer may construct the field drains on behalf of the owners or occupiers and recover the cost pro rata from such owners or occupiers.
Section 56 Supply of water from Irrigation work.
Notwithstanding anything contrary contained in the Act, the water from an irrigation work may be supplied:––
(a) as provided in section 57 ; and
(b) on an application for irrigation or non-irrigation purposes as provided in section 58.
(a) as provided in section 57 ; and
(b) on an application for irrigation or non-irrigation purposes as provided in section 58.
Section 57 Regulation of water supply from irrigation works.
An Assistant Executive Engineer may, after such inquiry as he deems fit, regulate in respect of any irrigation work for each year or part thereof or for a specified term of years at a time, as circumstances may require, the––
(a) time for letting out water for irrigation ;
(b) period of supply ;
(c) quantity of supply ; and
(d) areas to be supplied at different times.
Explanation:–– A land shall be deemed to have been supplied with water notwithstanding that the water is not utilised for irrigation provided that such non utilisation is solely due to the action or inaction on the part of the owners or occupiers interested in such land.
(a) time for letting out water for irrigation ;
(b) period of supply ;
(c) quantity of supply ; and
(d) areas to be supplied at different times.
Explanation:–– A land shall be deemed to have been supplied with water notwithstanding that the water is not utilised for irrigation provided that such non utilisation is solely due to the action or inaction on the part of the owners or occupiers interested in such land.
Section 58 Application for permission to use water from an irrigation work.
(1) Any person, desiring to have supply of water from an irrigation work for irrigating land not included in any area to which supply of water is regulated under section 57, shall make a written application to that effect to the Assistant Executive Engineer concerned, subject to any general or special order made by the Authority determining the extent of land for which water can be made available from such irrigation works, and the Assistant Executive Engineer may, if in his opinion such supply can be made without detriment to the supply of water to lands to which supply of water is regulated under section 57, order the supply of water for a period not exceeding six years subject to such conditions as may be specified in such order.
(2) If after six successive years of supply of water made to any land referred to in sub-section (1), the occupier, owner or beneficiary of such land applies for the supply of water being made permanent, such application, with the opinion of the Assistant Executive Engineer, shall be forwarded to the Executive Engineer concerned who shall take steps to include the land in the area to which supply of water is regulated by section 57.
(3) The water usage charges for the use of water for temporary cultivation under sub-section (1) shall be the normal water usage charges.
(4) With the sanction of and subject to such conditions, payments and restrictions, as may be imposed by the Government or such officer as may be authorised by the Government in this behalf, the Executive Engineer may, without detriment to the supply of water to lands to which supply of water is regulated under section 57, grant permission for water to be taken from an irrigation work, for use of domestic purposes, gharats, fish or cattle ponds and industrial purposes.
(5) If any person uses water from irrigation work without obtaining the permission required under this section, he shall, in addition to any penalty that he may incur under the Act for such unauthorised use of water, be liable to pay water usage charges at such rate as may be calculated by the Executive Engineer.
(2) If after six successive years of supply of water made to any land referred to in sub-section (1), the occupier, owner or beneficiary of such land applies for the supply of water being made permanent, such application, with the opinion of the Assistant Executive Engineer, shall be forwarded to the Executive Engineer concerned who shall take steps to include the land in the area to which supply of water is regulated by section 57.
(3) The water usage charges for the use of water for temporary cultivation under sub-section (1) shall be the normal water usage charges.
(4) With the sanction of and subject to such conditions, payments and restrictions, as may be imposed by the Government or such officer as may be authorised by the Government in this behalf, the Executive Engineer may, without detriment to the supply of water to lands to which supply of water is regulated under section 57, grant permission for water to be taken from an irrigation work, for use of domestic purposes, gharats, fish or cattle ponds and industrial purposes.
(5) If any person uses water from irrigation work without obtaining the permission required under this section, he shall, in addition to any penalty that he may incur under the Act for such unauthorised use of water, be liable to pay water usage charges at such rate as may be calculated by the Executive Engineer.
Section 59 Non-supply of water in certain circumstances.
The supply of water to any water course or field channel or to any person who is entitled to such supply shall not be stopped except––
(a) whenever, and so long as, it is necessary to stop supply for the purpose of maintenance of an irrigation work or for execution of any work ordered by the competent authority ;
(b) whenever, and so long as, any field channel by which such supply is received is not maintained in such repair as to prevent the wasteful escape of water thereof ;
(c) whenever, and so song as, it is necessary to do so in order to supply water in rotation to the legitimate demands of other persons entitled to water ;
(d) whenever, and so long, as it may be necessary to do so in order to prevent the wastage or misuse of water ;
(e) within the periods fixed from time to time by the Assistant Executive Engineer of which due notice shall be given ;
(f) whenever there is decrease in the supply of water in the irrigation work due to any natural or seasonal cause and so long as it is necessary to do so ; and
(g) for any reasons beyond the control of the Department.
(a) whenever, and so long as, it is necessary to stop supply for the purpose of maintenance of an irrigation work or for execution of any work ordered by the competent authority ;
(b) whenever, and so long as, any field channel by which such supply is received is not maintained in such repair as to prevent the wasteful escape of water thereof ;
(c) whenever, and so song as, it is necessary to do so in order to supply water in rotation to the legitimate demands of other persons entitled to water ;
(d) whenever, and so long, as it may be necessary to do so in order to prevent the wastage or misuse of water ;
(e) within the periods fixed from time to time by the Assistant Executive Engineer of which due notice shall be given ;
(f) whenever there is decrease in the supply of water in the irrigation work due to any natural or seasonal cause and so long as it is necessary to do so ; and
(g) for any reasons beyond the control of the Department.
Section 60 Sale or subletting of right to use water of irrigation work.
(1) No person entitled to use the water from any irrigation work shall sell or sublet or otherwise transfer his right of such use or use it for purposes other than irrigation.
(2) Every right to the supply of water for agricultural purposes to any land shall be deemed to have been transferred whenever a transfer of such land takes place.
(2) Every right to the supply of water for agricultural purposes to any land shall be deemed to have been transferred whenever a transfer of such land takes place.