THE JAMMU AND KASHMIR WATER RESOURCES (REGULATION AND MANAGEMENT) ACT, 2010
Administered Ministry: NO MINISTRY / PHE(I&FC)
Section
Section 81 Control of bed and banks.
(1) The control of the bed and banks of all water sources, navigation channels, intake channels, city channels and flood spill channels together with all works that affect the hydraulic conditions in the State shall be under the Irrigation and Flood Control Department.
(2) No reclamation or plantation in the bed or on the banks of a water course, navigation channel, intake channel, city channel or flood spill channel shall be permissible except under an authorisation by the prescribed authority.
(3) No extraction of any kind of material shall be made by any person in the bed or on the banks of any water source, navigation channel, intake channel, or flood spill channel without the identification of the site of extraction by an officer specifically empowered in this behalf by the prescribed authority, who shall before identifying such site or location ensure that––
(a) the extracted material is in a controlled quantity ;
(b) such extraction does not affect the flow of the water source ;
(c) such extraction does not affect the functioning of water supply or irrigation schemes in the vicinity ;
(d) such person undertakes to remove the extracted bed material simultaneously in order to ensure normal flow of water in the concerned water source.
(4) No building, railing or platform shall be constructed on the slopes of public or private embankments :
Provided that the prescribed authority or such other officer as may be specially authorised by it in this behalf, may accord permission to the construction of railings or platforms on any such slopes of public or private embankments subject to the conditions specified in the permission :
Provided further that in the case of any construction on any such public embankment, the prescribed authority shall fix a rent for the use of the land occupied by such construction.
(5) Any person putting up railings or constructing a platform in pursuance of permission granted under sub-section(4) shall maintain properly and keep in good state and repair the slopes of the embankment on which such railings or platforms are constructed.
(6) The officials of the Irrigation and Flood Control Department shall have access at all times to such slopes for purposes of inspection and repair.
(2) No reclamation or plantation in the bed or on the banks of a water course, navigation channel, intake channel, city channel or flood spill channel shall be permissible except under an authorisation by the prescribed authority.
(3) No extraction of any kind of material shall be made by any person in the bed or on the banks of any water source, navigation channel, intake channel, or flood spill channel without the identification of the site of extraction by an officer specifically empowered in this behalf by the prescribed authority, who shall before identifying such site or location ensure that––
(a) the extracted material is in a controlled quantity ;
(b) such extraction does not affect the flow of the water source ;
(c) such extraction does not affect the functioning of water supply or irrigation schemes in the vicinity ;
(d) such person undertakes to remove the extracted bed material simultaneously in order to ensure normal flow of water in the concerned water source.
(4) No building, railing or platform shall be constructed on the slopes of public or private embankments :
Provided that the prescribed authority or such other officer as may be specially authorised by it in this behalf, may accord permission to the construction of railings or platforms on any such slopes of public or private embankments subject to the conditions specified in the permission :
Provided further that in the case of any construction on any such public embankment, the prescribed authority shall fix a rent for the use of the land occupied by such construction.
(5) Any person putting up railings or constructing a platform in pursuance of permission granted under sub-section(4) shall maintain properly and keep in good state and repair the slopes of the embankment on which such railings or platforms are constructed.
(6) The officials of the Irrigation and Flood Control Department shall have access at all times to such slopes for purposes of inspection and repair.
Section 82 Traffic on embankments.
No vehicular traffic shall be allowed on embankments except with the permission of the prescribed authority.
Section 83 Power to remove obstruction.
(1) No person shall encroach upon, or cause any obstruction to, an embankment or slope thereof or the water-way of any water source.
(2) The prescribed authority, or any other person authorised by him in this behalf, may issue an order to the person making encroachment or causing obstruction or having control over any such encroachment or obstruction to remove such encroachment or obstruction within the time to be specified in the order.
(3) If within the time so specified, such person does not comply with the order, the prescribed authority or the officer authorised by him in that behalf, may remove such encroachment or obstruction and if the person to whom the order was issued does not, when called upon, pay the expenses involved in such removal, such expenses shall be recovered from him as arrears of land revenue.
(4) In removing the encroachment or obstruction, the prescribed authority or such officer as authorised by him to remove such encroachment or obstruction may, if necessary, requisition the help of the police.
(2) The prescribed authority, or any other person authorised by him in this behalf, may issue an order to the person making encroachment or causing obstruction or having control over any such encroachment or obstruction to remove such encroachment or obstruction within the time to be specified in the order.
(3) If within the time so specified, such person does not comply with the order, the prescribed authority or the officer authorised by him in that behalf, may remove such encroachment or obstruction and if the person to whom the order was issued does not, when called upon, pay the expenses involved in such removal, such expenses shall be recovered from him as arrears of land revenue.
(4) In removing the encroachment or obstruction, the prescribed authority or such officer as authorised by him to remove such encroachment or obstruction may, if necessary, requisition the help of the police.
Section 84 Excavation in lands.
It shall be lawful for the Irrigation and Flood Control Department to make excavations in land owned, occupied or held by any person , department, Corporation, Company or any other authority up to a depth of two feet and remove the earth so excavated therefrom for the purpose of construction and maintenance of an embankment.
Section 85 Special measures when danger of flood.
(1) Whenever it appears to the Government that it is necessary to take measures for the purpose of protecting life and property from the danger caused, or threatened to be caused, by floods in any area or locality, the Government may by order require all owners and occupiers of land in such area or locality to carry out such measures and for such period as may be specified in the said order.
(2) During the period specified in the order referred to in sub-section (1), any officer authorised by the Government in this behalf may, by a general or special order, require a Tehsildar of the Tehsil, or a Lambardar of the village specified in such order to furnish as many labourers as to the said officer as may be necessary and such labourers shall be paid wages at a rate which shall not be less than minimum wages fixed by the Government from time to time.
(3) When any requisition has been made to a Tehsildar or a Lambardar under sub-section (2), every labourer ordinarily residing within the Tehsil or village shall be liable to supply and to continue to supply his labour for the purposes it is requisitioned.
(2) During the period specified in the order referred to in sub-section (1), any officer authorised by the Government in this behalf may, by a general or special order, require a Tehsildar of the Tehsil, or a Lambardar of the village specified in such order to furnish as many labourers as to the said officer as may be necessary and such labourers shall be paid wages at a rate which shall not be less than minimum wages fixed by the Government from time to time.
(3) When any requisition has been made to a Tehsildar or a Lambardar under sub-section (2), every labourer ordinarily residing within the Tehsil or village shall be liable to supply and to continue to supply his labour for the purposes it is requisitioned.
Section 86 Safety of embankments.
For the safety of embankments and for protecting the life and property of the people, the prescribed authority shall––
(a) cause to be constructed flood gauges at different places in a water source particularly at locations, where there are habitations, indicating thereon danger marks, in bold and legible letters to make the public aware of the danger marks ; and
(b) to establish flood control rooms with warning system in all such areas which are prone to erosion or submergence in case of high floods in order to combat any emergent situation arising during the high floods in any water source.
(a) cause to be constructed flood gauges at different places in a water source particularly at locations, where there are habitations, indicating thereon danger marks, in bold and legible letters to make the public aware of the danger marks ; and
(b) to establish flood control rooms with warning system in all such areas which are prone to erosion or submergence in case of high floods in order to combat any emergent situation arising during the high floods in any water source.
Section 87 Extraction of bed material.
(1) Notwithstanding anything contained in any law for the time being force in the State, no licensee shall extract the bed material of any kind from any water source without the identification of the site of extraction by an officer specifically empowered in this behalf by the prescribed authority.
(2) The officer empowered under sub-section (1) shall, before identifying the site of extraction, satisfy himself that such extraction of material does not in any way change the course of the water source and that by such extraction no water supply or irrigation scheme shall be adversely affected.
(3) The officer empowered under sub-section (1) shall ensure that the bed material so extracted is removed on daily basis by the licensee so as to maintain regular or normal flow of water in the water source.
(2) The officer empowered under sub-section (1) shall, before identifying the site of extraction, satisfy himself that such extraction of material does not in any way change the course of the water source and that by such extraction no water supply or irrigation scheme shall be adversely affected.
(3) The officer empowered under sub-section (1) shall ensure that the bed material so extracted is removed on daily basis by the licensee so as to maintain regular or normal flow of water in the water source.
Section 88 Compensation for damage.
Compensation shall be awarded for the damages caused to any standing crop, tree, building or any other property by the entry, or in the execution of any work or operation under section 12, clause (d) of section 26, sub-section (2) of section 28 and clause (d) of subsection (1) and sub-section (3) of section 77.
Section 89 Procedure for award of compensation.
(1) The Assistant Executive Engineer, or any person on his behalf, entering any land, building or other property shall ascertain and record the extent of the damage, if any, caused by such entry, or in the execution of any work or operation to any crop, tree, building or any property and the value of material taken or utilised and, within one month from the date of such entry, compensation shall be tendered by him to the owner or occupier of the property.
(2) If such owner or occupier is not satisfied with compensation provided under sub-section (1), he may inform the Assistant Executive Engineer concerned accordingly and the Assistant Executive Engineer shall forthwith refer the matter for the purpose of determining the amount of compensation to the Executive Engineer.
(3) The prescribed authority may, at any time, or on the application made by any aggrieved person, revise or modify the order of the Assistant Executive Engineer under sub-section (1) or the Executive Engineer under sub-section (2) and its decision thereon shall be final.
(2) If such owner or occupier is not satisfied with compensation provided under sub-section (1), he may inform the Assistant Executive Engineer concerned accordingly and the Assistant Executive Engineer shall forthwith refer the matter for the purpose of determining the amount of compensation to the Executive Engineer.
(3) The prescribed authority may, at any time, or on the application made by any aggrieved person, revise or modify the order of the Assistant Executive Engineer under sub-section (1) or the Executive Engineer under sub-section (2) and its decision thereon shall be final.
Section 90 Installation of Unit for usage of water.
Save as otherwise provided under Chapters III, IV and VII, no person, group of persons, government department, local authority, corporation, company, society or any other body, by whatever name called (hereinafter in this Chapter called ‘the user’), shall install a unit requiring usage of water of any water source except under a licence issued by the licensing authority in accordance with the provisions provided hereinafter in this Chapter.
Section 91 Preparation of scheme for usage of water by the user.
(1) Any user intending to install a unit requiring usage of water for the purpose of––
(a) generation of electricity ;
(b) irrigation of land ;
(c) drinking purposes (domestic, commercial, industrial or institutional) ;
(d) running of water mills ; and
(e) exploration and exploitation of ground water,
shall prepare scheme and submit to the Authority accompanied by such fee and service charges as may be fixed by the Authority for approval.
(2) The said scheme shall specifically indicate the following––
(a) the location of the unit ;
(b) the source of water to be used ;
(c) the purpose for which the unit is to be installed ;
(d) the type of the unit whether domestic, commercial, industrial or for trading purposes ;
(e) the quantity of water required for such unit ; and
(f) the period for which the water is required.
(a) generation of electricity ;
(b) irrigation of land ;
(c) drinking purposes (domestic, commercial, industrial or institutional) ;
(d) running of water mills ; and
(e) exploration and exploitation of ground water,
shall prepare scheme and submit to the Authority accompanied by such fee and service charges as may be fixed by the Authority for approval.
(2) The said scheme shall specifically indicate the following––
(a) the location of the unit ;
(b) the source of water to be used ;
(c) the purpose for which the unit is to be installed ;
(d) the type of the unit whether domestic, commercial, industrial or for trading purposes ;
(e) the quantity of water required for such unit ; and
(f) the period for which the water is required.
Section 92 Approval of the scheme.
(1) After receipt of the scheme from a user, the Authority shall consider the viability of the scheme by taking into the account the following factors, namely :––
(a) whether the purpose of the proposed scheme is consistent with the State Water Policy ;
(b) whether the works required to be executed for the proposed scheme are detrimental to any existing, ongoing or proposed water supply, irrigation, flood control or any other scheme in the area ;
(c) whether the proposed scheme is consistent with the requirements of drinking water, irrigation, navigation, flood control or any other public purpose,
and make such inquiries and undertake such other studies, as it may deem necessary.
(2) If the Authority is satisfied that the proposed scheme is viable and meets all the requirements, it may, either approve the scheme as submitted by the user or with such modification as it may deems fit, or reject the same by assigning grounds for such rejection :
Provided that in case of a scheme relating to use of water for generation of electricity, the Authority shall submit its recommendations to the Government for approval of the scheme.
(3) If the user is aggrieved by an order passed by the Authority modifying or rejecting his scheme, he it may prefer an appeal to the Government within a period of thirty days from the date of such order and the decision of the Government thereon shall be final.
(4) In case of a scheme relating to use of water for generation of electricity, the Government may, on receipt of the recommendations from the Authority, take a decision either approving the scheme with or without modifications or rejecting the same :
Provided that no order shall be passed under this sub-section without the agreement of the Power Development Department and in case there is no such agreement, the scheme shall be submitted for orders of the Cabinet whose decision shall be final and binding.
(a) whether the purpose of the proposed scheme is consistent with the State Water Policy ;
(b) whether the works required to be executed for the proposed scheme are detrimental to any existing, ongoing or proposed water supply, irrigation, flood control or any other scheme in the area ;
(c) whether the proposed scheme is consistent with the requirements of drinking water, irrigation, navigation, flood control or any other public purpose,
and make such inquiries and undertake such other studies, as it may deem necessary.
(2) If the Authority is satisfied that the proposed scheme is viable and meets all the requirements, it may, either approve the scheme as submitted by the user or with such modification as it may deems fit, or reject the same by assigning grounds for such rejection :
Provided that in case of a scheme relating to use of water for generation of electricity, the Authority shall submit its recommendations to the Government for approval of the scheme.
(3) If the user is aggrieved by an order passed by the Authority modifying or rejecting his scheme, he it may prefer an appeal to the Government within a period of thirty days from the date of such order and the decision of the Government thereon shall be final.
(4) In case of a scheme relating to use of water for generation of electricity, the Government may, on receipt of the recommendations from the Authority, take a decision either approving the scheme with or without modifications or rejecting the same :
Provided that no order shall be passed under this sub-section without the agreement of the Power Development Department and in case there is no such agreement, the scheme shall be submitted for orders of the Cabinet whose decision shall be final and binding.
Section 93 Information to the User.
After the scheme is approved by the Authority under sub-section (2) of section 92 or by the Government under sub-section (4) of section 92, the Authority shall inform the user accordingly and require him to––
(a) obtain a licence for use of water under section 96 ;
(b) execute an agreement in such form and manner with the prescribed authority as may be prescribed ; and
(c) pay such fee and water usage charges as fixed under Chapter XI of the Act.
(a) obtain a licence for use of water under section 96 ;
(b) execute an agreement in such form and manner with the prescribed authority as may be prescribed ; and
(c) pay such fee and water usage charges as fixed under Chapter XI of the Act.
Section 94 Prohibition on installation of a unit.
No user shall install a unit requiring usage of water without adhering to the requirements of section 97.
Section 95 Ceiling on allocation of water.
The Authority shall fix the minimum and maximum ceiling of water to be allocated to a user for––
(a) generation of electricity (hydro-electric project) ;
(b) irrigation of land ;
(c) drinking purposes; (domestic, commercial, industrial or institutional) ;
(d) exploration of ground water ; and
(e) utilization of water for other purposes.
(a) generation of electricity (hydro-electric project) ;
(b) irrigation of land ;
(c) drinking purposes; (domestic, commercial, industrial or institutional) ;
(d) exploration of ground water ; and
(e) utilization of water for other purposes.
Section 96 Licence for usage of water.
No person shall install a unit, requiring usage of water or in any other way use the water, for––
(a) distribution of water ;
(b) undertaking trading in water directly or indirectly ;
(c) construction of dams on any water source ; and
(d) exploration or exploitation of ground water,
unless he is authorized to do so by a licence, issued under section 97.
(a) distribution of water ;
(b) undertaking trading in water directly or indirectly ;
(c) construction of dams on any water source ; and
(d) exploration or exploitation of ground water,
unless he is authorized to do so by a licence, issued under section 97.
Section 97 Grant of licence.
A user intending to use the water for any purpose specified in sub-section (1) of section 91 and section 96, may make an application accompanied with such fee as may be prescribed to the licensing authority for grant of licence under the Act :
Provided that in case the user is a government department, a local authority or a corporation owned and financed by the Government, it shall be deemed to be a licensee under the Act and shall not be required to obtain a licence under the Act.
Provided that in case the user is a government department, a local authority or a corporation owned and financed by the Government, it shall be deemed to be a licensee under the Act and shall not be required to obtain a licence under the Act.
Section 98 Procedure for grant of Licence.
(1) After receipt of an application for grant of licence under section 97, the licensing authority shall, as soon as possible, publish a notice in at least two daily newspapers describing the name and address of the person to whom it proposes to issue the licence with all particulars of the scheme and invite objections from the persons who are likely to be affected by the execution of such scheme.
(2) After considering the objections, if any, and the suggestions received in response to the notice as provided in sub-section (1) and after ascertaining that––
(a) the scheme of the applicant has been approved by the Authority or the Government, as the case may be ;
(b) the applicant complies with the requirements of capital adequacy and credit worthiness ; and
(c) the applicant possess a good moral conduct and is not involved in any criminal activity,
the licensing authority may issue a licence specifying therein the following––
(i) the quantity of water to be used by the licensee ;
(ii) the works for which the licence is issued ;
(iii) the source of water to be used by the licensee ;
(iv) in case of dam, the specifications thereof ;
(v) the amount of fee to be paid by the licensee ;
(vi) the period of validity of the licence ; and
(vii) other terms and conditions of the licence :
Provided that in case the area proposed to be covered under the scheme for which the licence is sought includes the whole or any part of any cantonment area, aerodrome, fortress, arsenal, dockyard or camp or of any building or place in the occupation of the Central Government for defence purposes, the licensing authority shall seek no objection to the grant of licence from the concerned Ministry of the Central Government before issuing such licence.
(3) If the licensing authority is of the opinion that the applicant does not qualify for grant of licence under the provisions of the Act or if it upholds the objections filed by any person against the grant of such licence, it may reject the application for grant of licence after recording the reasons therefor.
(4) Any person aggrieved by the decision of the licensing authority either granting the licence or rejecting the same may, where the Government is not the licensing authority, prefer an appeal to the Authority within a period of thirty days from the date of such decision and the Authority shall decide the said appeal after giving the aggrieved party a reasonable opportunity of being heard and its decision shall be final.
(5) Where the licensing authority is the Government, the aggrieved person may prefer a review petition within a period of thirty days from the date of decision, either granting the licence or rejecting same, and the decision of the Government on such review petition shall be final.
(2) After considering the objections, if any, and the suggestions received in response to the notice as provided in sub-section (1) and after ascertaining that––
(a) the scheme of the applicant has been approved by the Authority or the Government, as the case may be ;
(b) the applicant complies with the requirements of capital adequacy and credit worthiness ; and
(c) the applicant possess a good moral conduct and is not involved in any criminal activity,
the licensing authority may issue a licence specifying therein the following––
(i) the quantity of water to be used by the licensee ;
(ii) the works for which the licence is issued ;
(iii) the source of water to be used by the licensee ;
(iv) in case of dam, the specifications thereof ;
(v) the amount of fee to be paid by the licensee ;
(vi) the period of validity of the licence ; and
(vii) other terms and conditions of the licence :
Provided that in case the area proposed to be covered under the scheme for which the licence is sought includes the whole or any part of any cantonment area, aerodrome, fortress, arsenal, dockyard or camp or of any building or place in the occupation of the Central Government for defence purposes, the licensing authority shall seek no objection to the grant of licence from the concerned Ministry of the Central Government before issuing such licence.
(3) If the licensing authority is of the opinion that the applicant does not qualify for grant of licence under the provisions of the Act or if it upholds the objections filed by any person against the grant of such licence, it may reject the application for grant of licence after recording the reasons therefor.
(4) Any person aggrieved by the decision of the licensing authority either granting the licence or rejecting the same may, where the Government is not the licensing authority, prefer an appeal to the Authority within a period of thirty days from the date of such decision and the Authority shall decide the said appeal after giving the aggrieved party a reasonable opportunity of being heard and its decision shall be final.
(5) Where the licensing authority is the Government, the aggrieved person may prefer a review petition within a period of thirty days from the date of decision, either granting the licence or rejecting same, and the decision of the Government on such review petition shall be final.
Section 99 Licensee not to do certain things.
(1) No licensee shall, without prior approval of licensing authority :––
(a) undertake any transaction to acquire by purchase or takeover or otherwise, the utility of any other licensee or ;
(b) merge his utility with the utility of any other licensee.
(2) No licensee shall at any time assign his licence or transfer his utility, or any part thereof, by sale, lease, exchange or otherwise without the prior approval of the licensing authority.
(3) Before permitting any licensee to undertake any transaction or merge his utility under sub-section (1), or assigning his licence or transferring his utility under sub-section (2), the licensing authority, in case it is not the Government, shall seek the approval of the Authority.
(a) undertake any transaction to acquire by purchase or takeover or otherwise, the utility of any other licensee or ;
(b) merge his utility with the utility of any other licensee.
(2) No licensee shall at any time assign his licence or transfer his utility, or any part thereof, by sale, lease, exchange or otherwise without the prior approval of the licensing authority.
(3) Before permitting any licensee to undertake any transaction or merge his utility under sub-section (1), or assigning his licence or transferring his utility under sub-section (2), the licensing authority, in case it is not the Government, shall seek the approval of the Authority.
Section 100 Amendment of licence.
Where in its opinion the public interest so demands, the licensing authority may, on an application made by the licensee or otherwise, make such alternations and amendments in the terms and conditions of the licence as it thinks fit :
Provided that no such alternations or amendments shall be made to the detriment of the interests of the licensee except after giving the licensee an opportunity of being heard :
Provided further that where such alteration or amendment is made on the request of the licensee, the licensing authority shall, before making such alternation or amendment in the licence, publish a notice in at least two daily newspapers specifying the modification or alteration sought to be made by the licensee, invite objections from the persons likely to be affected by such modification or alteration and consider such objections, if any received.
Provided that no such alternations or amendments shall be made to the detriment of the interests of the licensee except after giving the licensee an opportunity of being heard :
Provided further that where such alteration or amendment is made on the request of the licensee, the licensing authority shall, before making such alternation or amendment in the licence, publish a notice in at least two daily newspapers specifying the modification or alteration sought to be made by the licensee, invite objections from the persons likely to be affected by such modification or alteration and consider such objections, if any received.